Street Fin Gazette
  • World News
  • Stock
  • Investing
  • Tech News
Investing

Altech Batteries Ltd$6M Placement to Advance Battery Projects

by October 14, 2025
by October 14, 2025 0 comment

Perth, Australia (ABN Newswire) – Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) (OTCMKTS:ALTHF) announces a capital raising of $6 million, comprising the issue of 133,333,334 fully paid ordinary shares in the capital of the Company at an issue price of $0.045 per Share. Participants in the placement will also receive free attaching listed options at 1 option for every 2 shares issued with an exercise price of $0.065 and expiry date of 31 October 2028.

Highlights

– Binding Commitments to raise $6 million at an Issue price of $0.045 per share

– Strong foundations set to deliver further trials and sales of UPS batteries, source project finance of CERENERGY(R), complete the 90kWh battery prototype and assess the 4 GWh Giga factory for large scale production

– Funds will be used to further progress a variety of value accretive activities at the CERENERGY(R), AMPower and Silumina AnodesTM Projects

The Shares and Options under the Placement will be issued out of the Company’s available capacity under Listing Rules 7.1. It is proposed that the shares will be issued on 20 October 2025. The options represent a new class of listed security and as such, will require a Prospectus to be issued prior to the options being allotted. Altech is now working on the Prospectus and aims to have it finalised within the coming weeks.

The Placement was jointly managed by Evolution Capital and Alpine Capital. The costs associated with the Placement was a combined 6% fee on all funds raised plus 60,000,000 options. Further details regarding the Placement are set out in the Appendix 3B of today’s date.

The funding establishes balance sheet flexibility for the Company to execute on the following near term `milestones:

– Trials and sales of Altech UPS batteries: Initial sales anticipated of advanced UPS batteries, targeting critical infrastructure customers across Europe, Australia, and the United States.

– Funding Deals: sourcing project finance for the 120 MWh CERENERGY(R) production facility in Germany, supporting large-scale commercial rollout.

– Pilot Plant and Battery Commercialisation News:

o Completion of the larger 90kWh battery prototype for the CERENERGY(R) project.

o Preliminary assessment for establishing a 4 GWh Giga factory for largescale production.

Managing Director Mr Iggy Tan stated ‘We are encouraged by the strong market interest in our current initiatives. This capital raise comes at an exciting time for Altech as it establishes its selling, distribution and installation infrastructure for AMPower produced Altech branded sodium nickel chloride (SNC) batteries and advances the commercialisation of its 120MWh CERENERGY(R) battery project. With the operation of the Silumina Anodes(TM) pilot plant completed and NDAs signed with major US and European car manufacturers, Altech is readying itself to provide commercial samples of the product. A portion of the funds will also be allocated to a preliminary study for a larger 4 GWh battery facility, marking the next significant step towards commercialisation’.

About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS (‘Fraunhofer’) to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech’s land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

Source:
Altech Batteries Ltd

Contact:
Corporate
Iggy Tan
Managing Director
Altech Batteries Limited
Tel: +61-8-6168-1555
Email: info@altechgroup.com

Martin Stein
Chief Financial Officer
Altech Batteries Limited
Tel: +61-8-6168-1555
Email: info@altechgroup.com

News Provided by ABN Newswire via QuoteMedia

This post appeared first on investingnews.com
0 comment
0
FacebookTwitterPinterestEmail

previous post
Locksley Resources LimitedFormer U.S. Major General Appointed to Advisory Board
next post
Crypto Market Update: Bitcoin Price Takes Hit Heading into Weekend

You may also like

Editor’s Picks: Gold Price Recovers from Biggest One-Day...

October 24, 2025

Ed Steer: Silver Rally Now Unstoppable, Price to...

October 24, 2025

Tech Weekly: Cloud Providers, Tech Stocks Outperform as...

October 24, 2025

Homerun Resources Inc. Financings Update

October 24, 2025

Shaakichiuwaanaan Project Set to Become Second Largest Lithium...

October 24, 2025

Crypto Market Update: Trump Pardons Binance Founder, Wall...

October 24, 2025

Angkor Finalizes Disposition of Oyadao North License in...

October 24, 2025

Torchlight Innovations Inc.Opens the Market

October 24, 2025

Thor Energy Plans to Recover Uranium, Critical Minerals...

October 24, 2025

Quimbaya Gold Announces Upsize of Bought Deal Financing...

October 24, 2025

Leave a Comment Cancel Reply

Save my name, email, and website in this browser for the next time I comment.

    Join our mailing list to get access to special deals, promotions, and insider information. Your exclusive benefits await! Enjoy personalized recommendations, first dibs on sales, and members-only content that makes you feel like a true VIP. Sign up now and start saving!


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Tech News

    • Argentina walks away from COP29 – amid fears Trump may pull US out of Paris climate deal

      November 14, 2024
    • Apple sued by Which? over iCloud use – with potential payout for 40 million UK customers

      November 14, 2024
    • There’s already a risk COP29 will end in failure – and damage of Trump 2.0 could yet spread

      November 13, 2024
    • Battle lines drawn on new climate fund despite ‘shot in the arm’ cash injection at COP29

      November 13, 2024
    • The Guardian quits Elon Musk’s X social media platform

      November 13, 2024
    • About us
    • Contacts
    • Privacy Policy
    • Terms and Conditions
    • Email Whitelisting

    Copyright © 2025 StreetFinGazette. All Rights Reserved.

    Street Fin Gazette
    • World News
    • Stock
    • Investing
    • Tech News